Project Description:
Reconstruction and widening of the Saleyard Drive Intersection Nebo
Scope:
Detailed earthworks, pavement construction, drainage infrastructure construction, subsoil drains, kerb and driveways, asphalt, bitumen seal, in-situ stabilisation and landscaping
Challenges:
Effective traffic planning was critical to the successful delivery of the project due to the high traffic volume consisting of heavy vehicles and wide loads