Hey, it seems you're using a browser that is a little past its time and our website might not be able to perform as it should. If you’d like to have the best experience on our website, you can easily find out about updating your browser here

dismiss this message
MENU

Barcoo Culvert Upgrades

Durack Civil was contracted by Barcoo Shire Council to reconstruct and upgrade a number of existing causeway structures that had been damaged during recent flooding.

Sites included Stonehenge Access Road, Yaraka Retreat Road and Haughton Vale Road. Scope of works included construction of new box culverts, headwalls, aprons, base slabs, pavement approaches, rock protection and concrete floodways and batter protection.

The remote sites required the use of a mobile concrete batch plant and superior planning due to the logistically challenging nature of the sites.