Project Description:
Upgrade of the Dysart Effluent Storage Dam for increased longevity
Scope:
Rock lining of the inside faces, embankment construction, pavement, drainage, pump infrastructure, landscaping, seepage drains, concrete works
Challenges:
Implementing a rigorous construction specification in a rural area required significant planning and technical experience