Gold Coast Council engaged Durack Civil to reconstruct the crib wall, drainage and road verge at Stapylton St Coolangatta.
Due to the close proximity to existing dwellings, Durack employed a soil nail slope stabilisation solution post earthworks to temporarily stabilise the slope during construction of the crib wall.
Works included asbestos removal and management, concrete pathway, drainage, Telstra and sewer realignments and pavement works.