Durack was engaged to complete the concrete demolition and bulk earthworks at the old ABC site in Toowong for a large residential construction project.
Durack managed all concrete demolition, recycling and haulage including geotechnical investigations and bulk and detailed footing earthworks.
2500 m3 of concrete was removed from site and taken to a local recycling yard for reuse as road base.