Murweh DFRA Packages 2 & 3

Description:

Reconstruction of various flood damaged roads within the Murweh Region as part of the Flood Damage 2019 and 2020 DFRA works - Charleville Qld and surrounding regions

Scope:

Heavy formation grading and gravel resheeting of over 200 km of unsealed road - including winning, carting and placing local ridge gravel, culvert repairs, concrete repairs, bitumen seal, insitu stabilisation and earthworks

Challenges:

Logistically challenging work environment with limited construction water and demanding road conditions