Resilience & Recovery
Road Stabilisation
DTMR Moonie Hwy DRFA
Client
DTMR
Value
$7.5M
Location
St George, QLD
Expertise
Road Stabilisation
Start Date
Oct 2023
End Date
Feb 2024
Scope
DTMR engaged Durack Civil to repair over 200 road infrastructure damage sites throughout the Western Downs Region along the Moonie Highway between Dalby and St George.
The project has a prequalification level of R2, F10, A1 and the scope of works included existing subgrade testing, 4 x different subgrade treatments, multiple types of pavement repairs including in-situ stabilisation & lightly bound pavement, heavy shoulder grading, silt and debris removal, C320 double-double spray seal, line marking.